Windhager’s new DuoWIN boiler which runs on pellets or logs was used for the design of this project and was only the second to be installed in the UK.  The boilers heat the main property and the B&B.

We designed a system with two weather compensated heating circuits and one hot water circuit, we also added two twenty tube evacuated tubes to the roof to provide a substantial amount of hot water free during the summer months which is held in a 500 litre twin coil cylinder.

We used Rehau heat main pipe work for the distribution of the heat to the properties from the main plant room.